go directly to the contents
EUChinaGRID

the EUChinaGRID deliverables

  • document no.: D3.1
  • document title: State-of-the-art in Security and Certification Authority preliminary report
  • deadline: 30/04/2006
  • delivery to EU due on: 14/06/2006
  • status: delivered
  • responsible partner: GRNET
  • document: http://www.euchinagrid.org/docs/EUChinaGrid-Del3.1v1.7.pdf
  • previous versions: none
  • abstract: Security is one of the most important factors that will determine the success or failure of Grid technologies in the long term. The Grid Architects need to design secure, interoperable infrastructures that will ensure the users’ privacy and the safety of their data, while retaining the ubiquitous nature of the Grid. This document provides an overview of the current standards and best practices in Grid Security.
  • related links:

Back to deliverables' table >>

powered by
Consortium GARR